|
|
|
|
Winter impressions from 20 Dec 2009.
|
The former picnic area with the new caddy hall in the back.
|
The entrance area. The building on the right is the old motor pool shed.
|
The chipping ground (former picnic area) with the sand bunker in the front and the driving range in the back. |
The garbage hill behind fairway No. 4 will partially be covered with
sun collectors (1MWp).
All pictures taken on 18 October 2003
|
Green No. 7 and t-box No. 8
|
The upper t-box No. 4 at the
slope of the garbage hill.
Right: the monster hole No
3, 606 yards long
|
|
All pictures from 21 September
2003.
Right: the picnic area near
the driving range.
In the middle: the club house
of the 1st Golf Club Fuerth
|
|
|
|
|
Areal
pictures from 17 August 2003.
The grass is brown after a long, hot and dry summer. The greenkeepers of
the golf course deserve their name. The storage areas are empty. One big
warehouse (top) is renovated by Daum electronics.
|
|
|
|
|
|
News
from the golf course:
Left: The golf course is growing: right of fairway 10 (on the left side)
a 6 hole public short course has been built.
Right: A new hole will be prepared behind the 10th green to be available
when we would have to return hole 17 which belongs to the City of Fuerth
(for industrial use). |
|
15
September 2002: three pictures from the golf course:
Left: view from fairway 10 to fairway 12 and hole 14.
In the middle: on fairway 12, the roof of the warehouse in the back is about
being renovated.
Right: fairway 3 with the garbage hill. |
|
|
|
|
|
|
|
|
New T-box fairway No 4 in winter. |
New water hazards in front of hole No 4 (to the right) |
New water hazard in front of hole No 6 |
Link
The golf course and the school (date unknown).
|
|
|
|
|
|
|
Photos: Knut Meyer |
|
|
|
2 July 1971: The reconstructed golf course is opened. The reconstruction
(in progress above left) was necessary because of the Main-Danube-Canal,
passing the Kaserne. |
|
|
|
|
|
|
|
|